Equipment:
There are two sets of whole train system, one set of positioning tooling, one set of manipulator and one set of conveyor belt.
Scheme Description:
The whole line system lists the embedded parts of different products. The positioning tooling places the embedded parts on the positioning tooling in turn. The manipulator takes the embedded parts from the tooling and places them in the mold. At the same time, the finished products are removed and placed on the conveyor belt.
characteristic:
The system is suitable for two or more different embedded parts on a single product, which are arranged by different whole system, and transferred to tooling positioning point by positioning tooling. The production is fully automatic without manual intervention.